Western Stevedoring Western StevedoringCompany ProfileFull Service StevedoringLynterm TerminalQuality AssuranceSafety
Online Cargo Tracking

Back To Home
Ship Schedules
Products Handled
Location
Location
Location
Whats New
Contact Us
Employment Opportunities
Web Site Map


OTHER LYNNTERM TERMINAL PAGES:

TERMINAL OPERATIONS
TERMINAL EQUIPMENT

PRODUCTS HANDLED

Centrally located in the Port of Vancouver, Lynnterm's state of the art facility is the consolidation centre for forest products, steel and break bulk in the Pacific Northwest. Lynnterm's location provides an unrestricted navigational gateway to the Pacific Rim and the world, building global connections, reliably and efficiently. On-line cargo tracking and a professional approach work together to provide premier terminal services that exceed all needs.  Providing proactive solutions, consistent performance and Quality Assurance is the criteria for choosing Western Stevedoring @ Lynnterm.

















::: Back to Top :::

LOCATION:

Port of Vancouver, British Columbia.

East Gate @ 15 Mountain Highway, North Vancouver, BC

West Gate @ 95 Brooksbank Avenue, North Vancouver, BC

TERMINAL AREA:

59 hectares (145 acres) with heavy-duty paved area for outside cargo storage.

BERTHING:

Seven berths, 1,516 metres in length (4,974') all concrete, depth alongside 12 - 15 metres (50') at low water.

WAREHOUSES:

Eight warehouses comprising 81,750 square metres (876,000 square feet) designed for storage of forest products, general cargo and steel. The warehouses are serviced by rail trackage and have covered loading aprons for trucks and railcars.

RAIL SERVICES:

Direct service by the Canadian National and interchange with all major railways. Approximately 9 km (5.6 miles) of track providing direct access to warehouse and storage area. A track along the dock face backed by an extensive holding area provides direct transfer-to/from-railcar capabilities. Railcar shunting equipment is available for switching on the site.

HIGHWAY ACCESS:

Trans Canada Highway #1 is minutes away, providing fast turnaround time to the trucking industry.

MAINTENANCE:

On-site maintenance compound for servicing and repairing of all terminal equipment and gear locker for the quick response of vessel and stevedoring gear requirements.

CONTAINERS:

The dock is equipped to accommodate the handling and stuffing/destuffing of containers. Mobile cranes are available upon request.

EQUIPMENT:

Over 200 pieces of specialized equipment with lift truck capacities up to 42,000 kg. (92,000 lb.) and trailer capacities up to 75,000 kg. (165,000 lb.) to meet your cargo handling requirements.

INTERNET ACCESS:

Password protected access for up-to-date cargo tracking information 24 hours per day worldwide.


COMPANY HEADQUARTERS

LYNNTERM EAST GATE
15 Mountain Highway
North Vancouver, BC
V7J 2J9
Phone: (604) 904-2800
Fax: (604)904-2801
Email: info@westeve.com